Skip to content
Novo Estimation

Discipline service

Material Quantity Takeoffs

Measured quantities delivered in editable Excel with a marked-up drawing set.

What we deliver

Everything included in this engagement.

The core deliverable: every measured item, organised by trade, with units, locations and drawing references so quantities can be traced back to the plans.

  • Editable Excel quantity workbook
  • Colour-coded marked-up drawing set
  • Quantities by area, level and trade
  • Waste and allowance assumptions stated
  • Open questions and RFI candidates listed
Marked-up construction drawing with measurement references
Typical deliverable: an editable Excel quantity workbook paired with a colour-coded marked-up drawing set. Sanitized demonstration material only.

Applicable project types

  • All sectors
  • Single trade
  • Full project
  • Partial packages

Included trades

  • All offered divisions

Process

How the work moves.

  1. 01

    Read

    Drawings, specifications and addenda are reviewed and the scope boundary is set.

  2. 02

    Measure

    Quantities are extracted on screen, item by item, with drawing references retained.

  3. 03

    Organize

    Items are categorised by trade and CSI division so gaps become visible.

  4. 04

    Calculate

    Quantities, labor and pricing are calculated using agreed rates and data sources.

  5. 05

    Deliver

    The estimate is issued in the agreed format with assumptions and exclusions stated.

FAQ

Before you send drawings.

Upload Your Plans.

Send the drawing set and the trades you need covered. We'll respond with scope, turnaround and price.

Get A Free QuoteUpload Plans